09:00 - 10:30 |
Mine production and mine planning (2) |
Applied geomechanics in mining (2) |
|
|
Chairmen
Ken Rhodes, Kjell Larsson |
Chairmen
Bre-Anne Sainsbury,
Vassilios Kazakidis |
|
|
Developing an optimised production forecast at Northparkes E48 mine using MILP
D. Rahal, J. Dudley and G. van Hout |
Influence of post-peak properties in the application of the Convergence-Confinement method for designing underground excavations
E. Alonso, L.R. Alejano, G. Fdez-Manín and F. García-Bastante |
|
|
Simulation applications at PT Freeport Indonesia’s DOZ / ESZ block cave mine
J. Botha, S. Watson, T. Arkadius and E. Samosir |
Numerical study of the mechanical behaviour of the damaged rock mass around an underground excavation
D. Saiang and E. Nordlund |
|
|
Utilization of secondary sizing data for improved block cave mine planning
A. Sinuhaji, S. Dessureault, E. Rubio and T. Casten |
Approach to estimate rock block geometry for determination of the Geological Strength Index (GSI)
B. H. Kim, F. T. Suorineni and P. K. Kaiser |
|
|
Draw management system
A. Susaeta, G. Valenzuela, G. País and D. Carkeet |
Sample selection for an AE stress measurement program at the Western Australian School of Mines
E. Villaescusa, L. Machuca and C. Windsor |
|
|
P.T. Freeport Indonesia's Deep Ore Zone mine - expanding to 80,000 tonnes per day
T. Casten, L. Rachmad, T. Arkadius, K. Osborne and M. Johnson |
Prediction of failure and fallouts in access drifts at the Kiirunavaara mine using numerical analysis
C. Edelbro |
|
|
|
Determination and verification of the longitudinal deformation profile in a horse-shoe shaped tunnel using two-stage excavation
P. Zhang, J. J. Yin, E. Nordlund and N. Li |
Coffee/Tea
|
|
Session Hall 1 |
Session Hall 2 |
|
11:00 - 12:15 |
Mining equipment and mine automation (3) |
Miscellaneous |
|
|
Chairmen
Greg Baiden, Aditya Parida |
Chairmen
Finn Ouchterlony, Brad Baker |
|
|
Bulk material transport in open cast mine – A study of design criteria
N. K. Nanda |
Industry perspective on Swedish mining research and development for sustained competitiveness
L.-E. Aaro, U. Marklund, M. Lindvall and G. Bäckblom |
|
|
Simulation of truck haulage queue system at an open pit mine using SIMIAN
D. Saiang |
Valuation of the productive chains of the global metallic mining using innovating tools of environmental management
S. A. Moreno, J. M. Rodriguez and J. A. Espi |
|
|
Enhancement of mining machineries availability trough supportability
B. Ghodrati |
Development of a corrosivity classification for cement grouted cable strand in underground hard rock mining excavations
E. Villaescusa, R. Hassell and A.G. Thompson |
|
|
On Line identification of minerals and bulk solids with the aid of laser induced fluorescence
J. Pollmanns |
Fire simulation in underground mines, smoke propagation and emergency plan evaluation
F. Giorgetti, G. Riganti and M. B. Díaz Aguado |
|
|
GIRON and WOLIS – Two mine applications
B. Adlerborn and M. Selberg |
Work culture and gender issues in a changing technical context - Examples from LKAB iron ore mine in Kiruna
L. Abrahamsson and J. Johansson |
Lunch
|
|
Session Hall 1 |
Session Hall 2 |
|
13:45 - 15:00 |
Mine production and mine planning (3) |
Transition of mining method (2) |
|
|
Chairmen
Rauno Pitkänen, Allan Moss |
Chairmen
Graham Swan, Doug Stead |
|
|
Prediction of confidence interval for the availability of the reserve stopes in the underground mining using Markov chains
S. E. Jalali, S. A. Hosseini, M. Najafi and M. Ameri |
Design and development update of the Grasberg block cave mine
C. A. Brannon, T. P. Casten, S. C. Hewitt and C. Kurniawan |
|
|
Impact of rock type variability on production rates and scheduling at the DOZ-ESZ block cave mine
C. Kurniawan and T. B. Setyoko |
Update on the Bingham Canyon mine underground studies
T. Brobst, M. Gaida and B. Dahl |
|
|
Block cave scheduling with a piece of paper
T. Diering |
Quantitative forecasting of sidewall stability and dilution in Sub-level caves
F. Reusch, D. Beck and D. Tyler |
|
|
Orebodies in shear: The role of geological controls and the implications for mine planning and design
F. T. Suorineni and P. K. Kaiser |
Chuquicamata underground mine - project status update
S. Fuentes and E. Adam |
|
|
The Management of Wet Muck at PT Freeport Indonesia’s Deep Ore Zone Mine
E. Samosir, J. Basuni, E. Widijanto and T. Syaifullah |
Grasberg block cave access and logistics support systems
S. Hewitt, Sudjatmoko, T. Casten and C. Brannon |
Coffee/Tea
|
|
Session Hall 1 |
Session Hall 2 |
|
15:45 - 17:00 |
Mine production and mine planning (4) |
Mass mining, mine design and case studies (3) |
|
|
Chairmen
Lars-Eric Aaro, Göran Bäckblom |
Chairmen
David Beck, Håkan Sellden |
|
|
Optimum open pit design with the use of genetic algorithm
H. N. Mirzaii and R. Khalokakaie |
A back analysis of dilution and recovery in longitudinal sublevel caving
J. Player and V. Perera |
|
|
Geotechnical considerations for planning and design of open stopes
E. Villaescusa |
Implications of widely spaced drawpoints
A. van As and G. J. van Hout |
|
|
Faster drifting in mining, some aspects
G. Nord |
A review of sublevel caving current practice
G. Power and G. D. Just |
|
|
Maximising capital development using the theory of constraints –
a theoretical approach
A. van Wageningen |
Non-dilution draw method and its application in sub-level caving mines in China
Z. Zhigui and L. Xingguo |
|
|
Optimizing productivity through performance measures for underground mining industry
A. Gustafson, A. Parida and A. Nissen |
Preconditioning implementation on rock bulks in Codelco Chile and its results
R.E. Molina, C.B. Cerutti, J.O. Henriquez, R.F. Morales and R.A. Apablaza |
| |
Session Hall 1 |
|
17:00 - 17:15 |
closing Session | |