|
Please visit this site
for regular update |
To monday 9 June >>
Tuesday 10 June
| |
Session Hall 1 |
|
08:30 - 09:30 |
Plenary Session (2)
Chairman: uday kumar |
|
08:30 - 09:00 |
Research in Mass Mining (ICS and MMT projects)
Gideon Chitombo, Bryan Mining and Geology Research Centre/
Alan Guest, De Beer's |
|
09:00 - 09:30 |
Sublevel Caving - Past and Future
William Hustrulid, Professor Emeritus, University of Utah
Rudolf Kvapil, Consultant Emeritus, Tucson, Arizona |
Coffee/Tea
|
|
Session Hall 1 |
Session Hall 2 |
|
10:15 - 12:00 |
Mining equipment and mine automation (2) |
Applied geomechanics in mining (1) |
|
|
Chairmen
Christoph Mueller, Uday Kumar |
Chairmen
Charlie C Li, Ernesto Villaescusa |
|
|
The introduction of IT into mass mining: the digital mine in Hambach surface mine
R. M. Schmitz, U. Kübeler, F. Elandaloussi, D. Lau and R-J. Hempel |
Evolution of ground support practices on Henderson’s lower levels
R. Golden Jr. and L. Fronapfel |
|
|
Measurements of borehole deviation in sublevel caving fans at Kiruna Mine
C. Quinteiro and S. Fjellborg |
New haulage level at Kiirunavaara — rock mechanics challenges and analyses
J. Sjöberg and L. Malmgren |
|
|
Mechanized continuous drawing system: A technical answer to increase production capacity for large block caving mines
V. Encina, F. Baez, F. Geister and J. Steinberg |
Geomechanical behaviour during the explotation of converging sectors in El Teniente mine
S. López Norambuena and H. Constanzo Beitia |
|
|
Primary jaw crusher inside underground mines, parameterization, optimization infrastructure and advantages. Simulation of the grinding
effects on rock fragmentation
G. Riganti and F. Giorgetti |
Practical considerations and models of the sublevel caving exploitation ‘Tinyag’ in Peru
D. Córdova, J. Cuadros and L.R. Alejano |
|
|
Application of seismic systems to pin-point the location of the drill bit in real time
C. Cosma, A. Nordqvist and G. Bäckblom |
Design of instope pillars in cut and fill mining for a gold mine in Ethiopia
K. A. Rhodes and T. Rangasamy |
|
|
Atlas Copco infrastructureless guidance system for high-speed autonomous underground tramming
J. Larsson, J. Appelgren, J. Marshall and T. Barfoot |
A review of fibrecrete quality control at the Argyle diamonds
underground project
P. Evans and A. Weir |
|
|
Rapid ramp haulage at Stawell gold mine
G. Wells, T. Cole and R. Almqvist |
Methodology for estimating the “serviceability” of the UCL pillars at El Teniente mine, new mine level project, Codelco Chile
P. Vásquez Vidal, J. Rubio Perez and P. Cavieres Rojas |
Lunch
|
|
Session Hall 1 |
Session Hall 2 |
|
13:30 - 15:00 |
Caving processes and gravity flow |
Subsidence and slope stability |
|
|
Chairmen
Yves Potvin, Andre van As |
Chairmen
Christina Dahnér-Lindqvist,
Peter Kaiser |
|
|
Real time sensing of rock flow in a block cave mine
G. R. Baiden, Y Bissiri and A. V. Saari
|
Numerical analysis of the influence of geological structures on the development of surface subsidence associated with block caving mining
A. Vyazmensky, D. Elmo, D. Stead and J. Rance |
| |
Simulating irregular cave propagation using PCBC
N. Burgio and T. Diering |
Numerical analysis of the hangingwall failure at the Kiirunavaara mine
T. Villegas and E. Nordlund |
|
|
An experimental review and simulations of gravity flow in coarse materials for block/panel caving
R Castro and R. Trueman |
Effect of rainfall on dump slope stability: A numerical approach
R. Koner and D. Chakravarty |
|
|
Calibration of mixing model to predict grade at Freeport’s DOZ Mine
D. Villa, R. Prasetyo and T. Diering |
Slope stability analysis using probabilistic method: a case study
A. Barabadi and J. Barabady |
|
|
Computational modelling of fines migration in block caving operations
C. R. Leonardi, D.R.J. Owen, Y. T. Feng and W. J. Ferguson |
Rock mechanics work at the Aitik open pit
J. Sjöberg and P-I. Marklund |
|
|
Block cave instrumentation, monitoring and management – A case example from Northparkes Lift 2
D. P. Allison and W. de Beer |
Numerical simulation of the hangingwall subsidence using PFC2D
T. Villegas and E. Nordlund |
Coffee/Tea
|
|
Session Hall 1 |
Session Hall 2 |
|
15:45 - 17:00 |
Mass mining, mine design and case studies (2) |
Transition of mining method (1) |
|
|
Chairmen
Gunnar Nord, William Hustrulid |
Chairmen
Peter Moser, Thomas Hedberg |
|
|
Tongkuangyu mine’s phase 2 project
L. Yuming and Z. Jinfeng |
Interaction between deep block caves and existing, overlying caves or large open pits
D. Beck and M. Pfitzner |
|
|
Cave management ensuring optimal life of mine at Palabora
D. D. Pretorius and S. Ngidi |
A model for determining optimal transition depth over from open-pit to underground mining
E. Bakhtavar, K. Shahriar and K.Oraee |
|
|
Bingham Canyon – North Rim Skarn cave
D. Hersant, R. Atkins and J. Singleton |
Planning the transition from SLC to block caving operations at Ridgeway gold mine
P. Manca and G. Dunstan |
|
|
Tunneling and construction for 140.000 tonnes per day - El Teniente mine – Codelco Chile
G. Díaz Copier and E. Morales Caro |
Geomechanics considerations in the Grasberg pit to block cave transition
E. C. Wellman, D. E. Nicholas and C. A. Brannon |
|
|
Initiation, growth, monitoring and management of the 7210 cave at Henderson Mine - A case study
G. Carlson and R. Golden Jr. |
Investigation of Underground Mining Potential at Xstrata Copper’s Ernest Henry Copper-Gold Mine
C. Carr, S. Perkins, M. Board, P. Ellen and A. Harrison |
TO WEDNESDAY 11 JUNE >>
|
sponsors and exhibitors
Read more...
NORDIC MINING TOUR, JUNE 7-15, 2008
Together with the MassMin conference, the NORDIC MINING TOUR takes you on a memorable journey through the Nordic mining society.
Read more...

|